Skip to content

Oil & Gas Pipe Welding

Pipeline and process-pipe welding for oil, gas, and industrial plant across Ghana — root, fill, and cap runs by qualified welders, NDT-inspected, on qualified procedures, on site or in our workshop. Welders Ghana, Takoradi to Tema, for over 15 years, priced on a survey.

Pipeline and process-pipe welding for oil, gas, and industrial plant — root, fill, and cap runs by qualified welders, NDT-inspected, on qualified procedures, on site or in our workshop. Welders Ghana has welded pipe across Ghana’s industrial belt for over 15 years. Call +233 27 011 3729 — tell us the line and service and we will arrange a survey.

Why Qualified Pipe Welding Matters

A pressure-carrying pipe joint is not finished when it looks welded — it is finished when it passes inspection. Oil, gas, and process lines fail at the weld, and they fail expensively: a leaking tie-in, a porous root run, a joint that never met the procedure. Welders Ghana welds pipe to qualified procedures, by welders qualified to ISO 9606, and inspects the result — so the line is traceable, documented, and built to carry what it is meant to carry.

Pipe Welding Systems We Build

Pipeline & Transmission Welding

Cross-country and in-plant pipeline joints — bevelled, fitted true, root-fill-cap to a qualified procedure, for oil, gas, and water transmission lines.

Process & Plant Pipework

Process pipe, manifolds, headers, and spools for refineries, terminals, and industrial plant — prefabricated in the workshop or welded in place at site.

Tie-Ins, Hot Spools & Repairs

Tie-in welds, replacement spools, and repair of leaking or rejected joints — cut out, re-prepped, re-welded to procedure, and re-inspected.

NDT-Inspected Joints

Welds backed by non-destructive testing — radiography, ultrasonics, dye-penetrant, or magnetic-particle — with results recorded for traceability.

What We Weld & Inspect

You needWhat we do
New pipeline / transmission lineBevel, fit, root-fill-cap to qualified procedure, NDT
Process / plant pipeworkSpool fabrication or in-place welding, inspected
Tie-in or hot spoolCut, prep, weld to procedure, re-inspect
Leaking / rejected jointCut out, re-prep, re-weld, re-test
Documented handoverWelds, welders, procedures, and NDT results recorded

How We Weld Oil & Gas Pipe

  1. Survey, drawings & procedure — material, thickness, and service agreed; welded to a qualified procedure.
  2. Prep, fit-up & root run — bevelled, aligned, root gap set, root run by welders qualified to ISO 9606.
  3. Fill, cap & inspect — fill and cap to procedure, then visual plus NDT where the joint calls for it.
  4. Document & hand over — welds, welder, procedure, and inspection results recorded and handed over.

Standards & Compliance

What It Costs

Oil and gas pipe welding is not a flat per-joint price — it depends on pipe size and wall thickness, material grade, the number of joints, the level of NDT required, and whether the work is on site or in the workshop. We price it on a survey of the line and the drawings, and give you a firm scope and quote — never a guess down the phone, and never the lowest-bid corner-cut that fails inspection.

Pipe Welding Across Ghana

We weld pipe across Takoradi, Tema, Tema Industrial Area, the Accra industrial belt, Kumasi, and the Western Region oil-and-gas corridor — at terminals, plants, yards, and on cross-country lines. We mobilise qualified welders and equipment to your facility, or prefabricate spools in the workshop and weld them in at site.

Areas We Serve

Welders Ghana welds oil, gas, and process pipe across Takoradi, Tema, the Greater Accra industrial belt, Kumasi, and the Western Region. On-site and workshop, for over 15 years.

Frequently Asked Questions

Do you weld to qualified procedures for oil and gas pipe? Yes — pipeline and process-pipe joints are welded to a qualified welding procedure by welders qualified to ISO 9606, with material grade and wall thickness agreed before work starts. We do not improvise pressure-carrying joints.

Can you do NDT on the welds? Yes — beyond visual inspection we arrange radiography, ultrasonics, dye-penetrant, or magnetic-particle testing on the joints that require it, and record the results so the line is traceable.

Can you weld pipe on site at our facility? Yes — we mobilise qualified welders and equipment to your plant, terminal, or yard for tie-ins, repairs, and new runs, or prefabricate spools in the workshop. We cover Takoradi, Tema, and Accra.

How much does oil and gas pipe welding cost? It depends on pipe size, wall thickness, material, the number of joints, and the NDT required — so we price it on a survey of the line and drawings, never as a flat per-joint rate down the phone.

Ready to start your project?

Request a custom quote. Same-day response.

Request a Specification